ZVU Engineering a.s., Hradec Králové, Czech Republic

Production Installation Piping systems Investments units Technological equipment

Hydrogen Skid Units

Our first assembly of skid units for ZVU Engineering a.s. It was the production of a hydrogen station.

IN &OFF SKID piping and process equipment for 25.000 Nm3/h Hydrogen Plant.

In total, the following items were installed:

7 pcs of skids
160t of piping
8t of storage
11 apparatus 
The order was completed including painting, insulation and packaging.
In total, 35,000 hours were worked.
Manufactured in accordance with ASME and PED regulations (CAT 4.3, I and II).

Work on the skids took 6 months.